[新聞] 777X靜力測試發生機身破裂

看板Aviation作者 (winte639)時間4年前 (2019/11/28 18:49), 編輯推噓12(1206)
留言18則, 16人參與, 4年前最新討論串1/4 (看更多)
媒體:CNBC 日期:2019.11.27 來源:https://www.cnbc.com/2019/11/27/boeing-777x-fuselage-reportedly-split-during-september-stress-test.html ------ The fuselage of a Boeing 777X split open during a stress test in September, according to the Seattle Times, damage that was more severe than was previously disclosed. A Boeing spokesman told CNBC that the result occurred in the final minutes of the aircraft test and it won’t impact its already-delayed delivery timeline of the wide-body planes. He added that the incident involved a depressurization of the fuselage and that it happened when the plane was bearing 99% of the test load. While Boeing previously acknowledged an issue with the test of the plane, during which a door blew off the aircraft, in September, the Seattle Times said on Wednesday that it obtained photos suggesting that the damage was worse than originally reported. “The test plane is a complete write-off, its fuselage skin ripped wide open just behind the wing,” the Seattle Times wrote. The test involved bending the wings to an angle “beyond anything expected in commercial service,” a Boeing spokesman said, a routine test for new aircraft. Boeing does not anticipate that this incident will impact the timeline of the 777X’s first flight or deliveries. “We do not see any impact from the test on the overall program schedule,” the statement said. Boeing said it still it expects to start delivering the planes in early 2021, later than the end of 2020 it was originally targeting, due to delays with the General Electric GE9X engines. “As we’d said for some time, there had been significant risk to the late 2020 timeline,” the company said in a statement. “For example, the timing of engines for the remaining flight test airplanes will affect when they begin flying, which in turn affects our detailed test schedules.” Boeing shares were down less than 1% in afternoon trading. On Wednesday there was also ews that the FAA would maintain even tighter control over safety checks of the manufacturer’s beleaguered 737 Max planes, which have been grounded since mid-March after two fatal crashes. ------------------ 繼777X貨艙門側時爆炸的意外後 媒體暴露於今年九月時,對777X機翼進行壓力測試時,在達標前一刻機翼後方的機身發生破裂 波音聲稱不會影響到交機時程,仍將在2021年前期交機 原先預定於2020年底交機,因為GE9X引擎的問題造成交機時程延後 上次的貨艙門的意外雖然沒有照片,但這次西雅圖時報取得了意外相關照片 https://i.imgur.com/uVThKPu.jpg
---------------- 一波未平一波又起,看這個照片是整個蒙皮被扯裂失效了 737Max看來今年結束前還沒辦法回到空中,777X又發生這樣的事情 波音到底是鬆了幾根螺絲......囧 -- Sent from my Windows -- ※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 118.241.223.167 (日本) ※ 文章網址: https://www.ptt.cc/bbs/Aviation/M.1574938192.A.98C.html

11/28 19:13, 4年前 , 1F
波音月常
11/28 19:13, 1F

11/28 19:16, 4年前 , 2F
建議波音改主推 Stearman Model 75?!
11/28 19:16, 2F

11/28 19:40, 4年前 , 3F
上次艙門這次機身…唉
11/28 19:40, 3F

11/28 19:42, 4年前 , 4F
不過其實這算好了,畢竟在測試階段,如果像737MAX這樣的話
11/28 19:42, 4F

11/28 19:42, 4年前 , 5F
已經給各大航空公司用才發現這件事,我看波音應該要破產了
11/28 19:42, 5F

11/28 19:53, 4年前 , 6F
自曝其短
11/28 19:53, 6F

11/28 20:16, 4年前 , 7F
太扯了吧……波音整個壞掉了
11/28 20:16, 7F

11/28 20:24, 4年前 , 8F
波音到底怎麼了?災情不斷
11/28 20:24, 8F

11/28 20:35, 4年前 , 9F
If it’s not Boeing I am........never mind
11/28 20:35, 9F

11/28 20:42, 4年前 , 10F
777別改X了這樣就好
11/28 20:42, 10F

11/28 20:48, 4年前 , 11F
怕爆
11/28 20:48, 11F

11/28 20:58, 4年前 , 12F
該換型號了
11/28 20:58, 12F

11/28 21:15, 4年前 , 13F
這些Mock不是應該都有經過電腦模型計算 怎麼會出這種錯
11/28 21:15, 13F

11/28 21:33, 4年前 , 14F
或許是設計是1.4倍結果到1.3就爆了~
11/28 21:33, 14F

11/28 22:42, 4年前 , 15F
這真的不是鬆了幾根螺絲而已 我看是結構都壞了....
11/28 22:42, 15F

11/28 22:46, 4年前 , 16F
757復刻出來賣好了
11/28 22:46, 16F

11/28 22:56, 4年前 , 17F
波音要不要重組算了
11/28 22:56, 17F

11/29 09:30, 4年前 , 18F
感恩節才爆出來要懂得感恩 假期過後大家就忘了 股票繼續漲
11/29 09:30, 18F
文章代碼(AID): #1TtwPGcC (Aviation)
討論串 (同標題文章)
文章代碼(AID): #1TtwPGcC (Aviation)