Re: [參考] DV2019 timeline
※ 引述《killer01 (killer01)》之銘言:
: 很幸運抽到DV2019, CN:2XXX. 目前是 F1. 走AOS, 以下是我的timelines, 提供給
: 需要的版友參考.
09/05/2018 - 2NL
11/09/2018 - File AOS package
11/13/2018 - Package Deliver
11/20/2018 - Acceptance Text
11/21/2018 - Check cashed
11/26/2018 - NOA letter received
11/30/2018 - Bio letter
12/04/2018 - Bio walk-in (Schedule date is 12/14/2018)
01/07/2019 - IL received
01/17/2019 - Interview
01/24/2019 - GC received
感謝版主及大家的幫忙!
--
※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 70.121.44.170
※ 文章網址: https://www.ptt.cc/bbs/Immigration/M.1548390903.A.305.html