[問題] 計組-管線計算
請教一題計算
Suppose that 20% of the instruction are loads, and half of the time
the instruction following a load insruction depends on the result of
the lod. If this hazard creates a single-cycle delay, how much faster
is an idea pipelined machine (with CPI of 2) that does not delay the
pipeline, compard to this realistic pipeline that may create a single-
cycle load stall delay?(Ignore any stalls other than load stalls)
書上寫:
cpi=2+ 20% *50% *1 =2.1
perfect pipeline machine 快了 2.1/2=1.05
請教一下,cpi第一個式子,那個*1 是在乘什麼呢? 謝謝
--
※ 發信站: 批踢踢實業坊(ptt.cc)
◆ From: 61.228.97.36
推
05/08 19:07, , 1F
05/08 19:07, 1F
→
05/08 19:11, , 2F
05/08 19:11, 2F
→
05/08 20:31, , 3F
05/08 20:31, 3F
→
05/08 20:37, , 4F
05/08 20:37, 4F